The site and area is marked out prior to commencing excavations. We then clear the area and excavate to a suitable depth prior to installing a new hardcore as required. This is then leveled and compacted to form a solid foundation. A laying course of washed grit sand is then laid, compacted and screeded forming a level base for laying.
INSTALLATION Blocks are laid in accordance with your specifications in a pattern and colour of your choice.
Edgings, manholes, drainage and gullies are then set at the correct levels and concreted into place.
The paving is is then swept and cleaned prior to finishing.
FINISHING Having installed the blockwork the final procedure involves sweeping a specially formulated kiln dried sand Into the joints to prevent movement.
The paved area is then re-compacted and cleaned removing all waste and left ready for you to use.